In addition to Ingredient and Packaging costs of production you can track variable Labour and Overheads costs associated with products.
To Add Labour or Overheads to your Cybake first go to Recipes / Labour & Overheads
Select Add Labour and populate with name, time and Rate.
repeat the same process to add any overheads.
Once your Labour and Overheads are setup you can add them into any recipes. Go to Recipes / Recipes and load your product. see Guide - Creating Recipes
As well as the steps outlined in the Recipes guide you have the Lab & Over Tab that can be used to add in any labour and overhead costs.
Select Add Labour and your existing costs will be available in the drop down list and can be added to the recipe.
Your cost will be reflected in the costings as part of the Recipe info Tab.
Note: this will include and Labour and Overhead costs associated with with sub recipe and Mix components of your product.
Comments
0 comments
Please sign in to leave a comment.